LV Power Solutions were proud to work on this project, which required our design engineers to work closely with the client to develop a design which ensured no loss of power to the Banks extensive servers. The system was split into two Switchboards; Switchboard one was a UPS input/output panel for both A and B… Read more »
Month: February 2020
Why Involve Your Switchgear Partner at the Early Stages of Project Planning?
When is comes to large commercial and industrial projects, the installation of switchgear usual comes towards the end of the big build. As a result, a switchgear manufacturer rarely has the opportunity to get involved with the design of the project and is usually provided with a specification to develop a system which must fit…. Read more »