Month: June 2020

Case Study: Arndale, Manchester

The LV Power design team worked closely with the client to develop a design which ensured minimal downtime during power outages. The system was split into two Switchboards; Both Switchboard 1 (left) and 2 (right) were backed by Mains Supply with a 1250A ACB. The design tied both boards together with a 1250A ACB buscoupler…. Read more »

Sustainability and Future Proofing

When it comes to developing sustainable products, it’s not just about tweaking a design or value engineering a project, it’s about adopting a new approach to design which considers the sustainability of each component and ensures switchgear is built to last and not be prone to early replacement through fault or damage. Advances in technology… Read more »