Category: Uncategorized

Case Study: Arndale, Manchester

The LV Power design team worked closely with the client to develop a design which ensured minimal downtime during power outages. The system was split into two Switchboards; Both Switchboard 1 (left) and 2 (right) were backed by Mains Supply with a 1250A ACB. The design tied both boards together with a 1250A ACB buscoupler…. Read more »

Sustainability and Future Proofing

When it comes to developing sustainable products, it’s not just about tweaking a design or value engineering a project, it’s about adopting a new approach to design which considers the sustainability of each component and ensures switchgear is built to last and not be prone to early replacement through fault or damage. Advances in technology… Read more »

Case Study: Cannon Street, Central London

LV Power Solutions were proud to work on this project, which required our design engineers to work closely with the client to develop a design which ensured no loss of power to the Banks extensive servers. The system was split into two Switchboards; Switchboard one was a UPS input/output panel for both A and B… Read more »

Why Involve Your Switchgear Partner at the Early Stages of Project Planning?

When is comes to large commercial and industrial projects, the installation of switchgear usual comes towards the end of the big build. As a result, a switchgear manufacturer rarely has the opportunity to get involved with the design of the project and is usually provided with a specification to develop a system which must fit…. Read more »